Consulting Engineering
|
||||||||||
|
|
Mazama Village Water Main
Replacement |
|||||||||
|
Client: City of ![]() Project: The existing distribution water mains were installed in close proximity This project constructed about 3000 feet of new 8” water mains and services. A corrosion survey resulted in polyethylene encasement for the main line and installing sacrificial anodes on the new water services. Responsibilities: Engineering Planning, Design and Construction Consultation. |
||||||||||
|
||||||||||