|
||||||||||
|
Consulting
Engineering
|
||||||||||
|
|
Gallery WATER PROJECTS EXPERIENCE Newell
Water System Improvement
Client: Newell Count Water District, Newell County, California Project: Construction of new 100,000-gallon water storage tank, replacement of selected water mains, reconditioning of existing wells, and installation of water meters. ![]() Responsibilities:
Hammond
Engineering's responsibilities included engineering
planning, design, and
construction management. This included replacing 30,423 LF
of various sized water mains, reconditioning/replacing 3 well pump
meters, correcting the wiring /lighting in the storage tanks as well as
the water main, repairing pump number 2 and installing a chlorination
system in that pump, and repairing and repainting the existing water
storage tanks.
Back to Project Galleries List |
|||||||||
| |
||||||||||
| |
||||||||||
|
||||||||||