|
||||||||||
|
Consulting
Engineering
|
||||||||||
|
|
Gallery WATER PROJECTS EXPERIENCE Mazama Village Water Main Replacement Client:
City
of ![]() Project:
The
existing
distribution water mains were installed in close proximity
This project constructed about 3000 feet of new 8” water mains and services. A corrosion survey resulted in polyethylene encasement for the main line and installing sacrificial anodes on the new water services. Responsibilities: Engineering
Planning, Design and
Construction Consultation.
|
|||||||||
| |
||||||||||
| |
||||||||||
|
||||||||||