Hammond Engineering Inc.
Consulting Engineering
     

Background
Services
Qualifications
Gallery
Contact

Our success depends on our ability to provide responsive service to the needs of our clients.

  Gallery

WATER PROJECTS EXPERIENCE

Beall Lane Water Main Extension

Client:  City of Central Point, Oregon

Project:  The City was experiencing difficulty in filling their  water storage tank during periods of high demand.  It was decided to create a new point of service to the water purveyor, Medford Water Commission, and install a new 16” water main that would replace the existing 8” and 10” pipelines.

Beall Lane Water Main Extension

The project consisted of installing  a 12” backflow preventer, a new water meter and flow control valve and approximately 1,500 feet of new water main. 

Responsibilities:  Engineering Planning, Design, and Construction Consultation

Back to Project Galleries List



4802 Industry Drive
Central Point, Oregon 97502
Voice: (541) 776-3327
Fax: (541) 858-2008
E-mail: hei@hamengr.com

 

® Copyright Hammond Engineering Inc. 2003
All Rights Reserved.
Created by Marilyn Irons
Hammond Engineering - Gallery
gallery.html
Last modified 6/1/04